I continued progress on the electrical panel. It is missing one more ground wire (from the battery). Then it will be done. I also cut some stainless standoffs and a plexiglass window as a cover. But I am waiting until I'm done making dust in the vicinity before I install it.
Also got the third and last big piece of decking installed aft of the second beam holder.
A couple of journal notes:
For the aft side of the aft beam holder the beam holder bracket bolts need to be installed at 1-3/4"
For the forward side of the aft beam holder the beam holder bracket bolts need to be installed at 2-1/2"
Looking ahead, there is lots of epoxy/carpentry to be done. Several small decking pieces, the aforementioned beam bracket bolt T-nuts (stern beam too), and the hatch opening trim and cover. The hatch work is going to be a lot of steps to finish. If have any discipline at all I will start making nav. light trim pieces at the same time.
Lastly, I noticed I never put up a pic of how the second pieces of decking looks now that it is fully trimmed and coated.
No comments:
Post a Comment